We will be performing a switch upgrade on July 9th beginning at approximately 11:30 PM EDT (-0400 GMT). During this time, switches will be exchanged in the cabinet affecting 64.22.68.1/24. All sites are expected to incur a brief 5 –
We will be performing a switch upgrade on July 9th beginning at approximately 11:30 PM EDT (-0400 GMT). During this time, switches will be exchanged in the cabinet affecting 64.22.68.1/24. All sites are expected to incur a brief 5 –